A new 120,561 SF, three-story facility at Golden West College which included lecture spaces, laboratory space, computer labs and support space for the Math, Biology, Life Science and Physical Science departments. There will also be a STEM Center for students
This project was the renovation of a 19,000 SF2-story steel frame and stucco building (builtin the 1980s) which houses a restaurant, retailand classroom space located at College Ave &Paseo near SDSU. The scope included structuralupgrades, new finishes, and MEP F/P.
This medical office building houses disease-specific centers consolidating all outpatient, ancillary, professional and support services needed to treat specified conditions.
- Location La Jolla, California
Project Management, Architecturally Significant Equipment
This project included a 67,924 SF, 3-storyclassroom as well as a 70,000 SF above groundparking garage. Baker provided power, lighting,fire alarm, intrusion control, and area of refuge tothe higher education building.
Baker Electric developed, designed, installed, and managed the performance of an energy efficient retrofit of all exterior lighting at CSU San Bernardino. Retrofit included parking lots, two parking structures, roads and walkways at California State University San Bernardino and Palm Desert Campuses. This project spanned across approximately 384,000 SF.